This project consisted of a full bathroom renovation, constructed to design specifications. The project started with a full strip-out all of the exisiting bathroom materials and features, taking the bathroom all the way back to the studs and original substrate. Once the bathroom was stripped, the Protect & Seal plumbing and electrical team were on
