Berowra Heights Bathroom Renovation

This project consisted of a full bathroom renovation, constructed to design specifications.

The project started with a full strip-out all of the exisiting bathroom materials and features, taking the bathroom all the way back to the studs and original substrate. Once the bathroom was stripped, the Protect & Seal plumbing and electrical team were on site to do the rough-out. The bathroom was then sheeted and all areas were treated to the Protect & Seal waterproofing service.

The Protect & Seal tiling team came in and screeded the floor and began the tiling process for the floor and walls. We used 600mm x 600mm speciality porcelain tiles that are long lasting and have an exquisite look.

Our plumbing team was then back on site with the project manager to do the full fit out of the vanity, taps, shower head, shower screen, toilet and other bathroom accessories.

The walk in shower shower was to be a feature element of the bathroom and for this we used a 1m x 2m glass panel for the shower screen and a rain type shower head on a rail with a hand held option.

The end result was a magnificent bathroom that is now a feature of the home with the added bonus an increase in value for the property itself.

More Information

This Protect & Seal Bathroom Renovation project in Berowra Heights consisted of a full bathroom renovation, constructed to design specifications. The end result was a magnificent bathroom that is now a feature of the home with the added bonus an increase in value for the property itself.

Date : 23rd September 2020

Tags : Shower Repair, Leaking Shower

Location : Berowra Heights

Clients Feedback

Testimonial Image

Eddy was fantastic! Turned up when he said he would, did the work in the time he stated and was extremely respectful. I would definitely call on him again. 5 stars! I have had shocking experiences with Tradies in the past and Eddy was awesome.

Carol Jenkis

Client
Testimonial Image

Eddy and his team completed the tiling job quickly and on time. They achieved a high standard at a competitive price.

Richard Castleford

Consultant
1500
+
LEAKS FIXED
800
+
BATHROOMS RESTORED
500
+
BALCONIES REPAIRED
4550
+
HAPPY CUSTOMERS